- HTM 01-04 (NHS England) gives guidance for processing linen used in health and adult social care. Its Social care volume sets an Essential Quality Requirement (EQR) level and a Best Practice (BP) level.
- At BP level it says an industrial/commercial-type washing machine capable of the disinfection requirements is required, with a hot wash of 71°C for at least three minutes or 65°C for at least ten minutes recommended, or a chemical disinfection process that meets the HTM (Social care volume, 3.3).
- At BP level, the machine's disinfection stage must be validated at least annually (3.4), and there should be a separate laundry area with clean and soiled linen physically separated (3.5).
- At EQR level, keep a logbook of service and repair visits and written policies for operating the machines; process should keep dirty and clean items and areas apart, with hand-washing facilities and a segregated dirty area for sluicing (3.2).
- Two categories in a simple on-site care home: standard (white) and enhanced (red, sealed in a red water-soluble bag, outer bag marked 'Infectious linen') (5.2). The enhanced process uses at least 60°C, and at BP level a thermal or chemical disinfection cycle (6.5, 6.6).
- Don't overload machines, select a pre-wash/sluice cycle for heavily soiled items, never open inner water-soluble bags, and store processed linen in a clean area above floor level (6.8 to 6.12).
- The DHSC code of practice says linen and laundry provision should be appropriate for the level and type of care, and policies should cover the classification and sorting of used and infected linen. CQC's Regulation 15 says equipment must be clean and properly maintained.
What are the laundry regulations for care homes?
In England there isn't a single 'laundry law'. Care providers must assess and control the risk of infection (CQC Regulation 12) and keep equipment clean and properly maintained (Regulation 15); the DHSC code of practice sets out what's expected for linen and laundry; and NHS England's HTM 01-04 is the detailed guidance on how linen should be handled and decontaminated.
| Source | What it says about laundry | Status |
|---|---|---|
| CQC Regulation 12 | Providers must assess the risk of, and prevent, detect and control the spread of, infections | Regulation (Health and Social Care Act 2008 regulations) |
| CQC Regulation 15 | Premises and equipment must be clean, suitable, properly maintained, and used properly | Regulation |
| DHSC code of practice | Storage, supply and provision of linen and laundry appropriate for the level and type of care; policies for classification and sorting of used and infected linen | Code of practice; its guidance 'is not mandatory but is considered to represent the basic steps' required to meet its criteria |
| HTM 01-04 (NHS England) | Handling, segregation, washing and disinfection of linen; machines, validation and laundry layout | Best practice guidance with EQR and BP levels |
| National IPC manual for England | Safe management of linen in standard infection control precautions | National guidance |
What does HTM 01-04 require of care home washing machines?
At the Essential Quality Requirements (EQR) level, a household washing machine with an EU Ecolabel A wash-performance rating (or equivalent commercial model) can be used for the standard process. At Best Practice (BP) level, HTM 01-04 calls for an industrial/commercial-type machine that can meet its disinfection requirements, professionally installed and maintained, with its disinfection stage validated at least annually.
Essential Quality Requirements (EQR)
- Replacement machines: consider a household machine with an EU Ecolabel wash performance rating of A (not the energy rating) measured to BS EN 60456, "or equivalent commercial model" (3.2, 6.3)
- A logbook of service and repair visits, available for inspection, and written policies for operating the washers and dryers (3.2)
- Staff trained to dose correctly and not overload; processes that protect staff and residents (3.2)
- Procedural segregation of clean and dirty items and areas, hand-washing facilities, and a segregated dirty area for removing solids and sluicing (3.2)
- Processed linen stored in a clean area above floor level, not in the laundry area (3.2)
Best Practice (BP)
- An industrial/commercial-type washing machine able to meet the disinfection requirements; a hot wash of 71°C for at least 3 minutes or 65°C for at least 10 minutes recommended, or a validated chemical process (3.3)
- Professionally installed and maintained (3.3)
- Disinfection stage validated at least annually, likely by an external validation contractor or the manufacturer (3.4)
- A designated, separate laundry area with clean and soiled linen physically separated throughout (3.5)
- Where the enhanced process is regular: minimal manual handling of infectious linen, for example water-soluble bags (3.6)
Paragraph numbers refer to the HTM 01-04 Social care volume. HTM 01-04 also notes that some small care homes run linen processing similar to normal domestic arrangements, which can continue for existing installations as long as EQR attainment is achieved (2.5).
What are the standard and enhanced laundry processes?
The standard process is for most residents' linen most of the time. The enhanced process is used when there are triggers suggesting linen may be infectious, such as unexplained diarrhoea and vomiting or a confirmed infection. Each has its own bag colour and wash.
| Standard process | Enhanced process | |
|---|---|---|
| When | Most of the service-users most of the time (6.1) | Triggers such as unexplained diarrhoea and vomiting, confirmed infection, unexplained rashes, confirmed scabies or lice, unexplained fever (6.4) |
| Bagging | Off white or white; soiled and fouled items in a water-soluble bag (and a white cotton sack if required) or a white impermeable bag; remove solids first (5.2) | Red: sealed in a red water-soluble bag immediately on removal from the bed, inside an impermeable or nylon/polyester bag marked "Infectious linen" (5.2) |
| Wash | Highest suitable temperature for the garment care label (6.3) | A cycle of at least 60°C, or the highest temperature suitable for heat-sensitive items (6.5); at BP, thermal disinfection (71°C for 3 min or 65°C for 10 min) or a compliant chemical process (6.6) |
| Handling | Don't overload; pre-wash/sluice for heavily soiled items (6.9, 6.10) | Laundry staff never open the inner water-soluble bags; the bags go straight into the machine (6.8) |
Thermal disinfection: the two holds
HTM 01-04 says the washing process should have a disinfection cycle in which the temperature of the load is held at 65°C for not less than ten minutes or 71°C for not less than three minutes when thermal disinfection is used.
It adds mixing time to make sure heat gets right through: 4 minutes for conventional machines and those with a low degree of loading (under 0.056 kg/L), and 8 minutes for heavier loading.
Source: HTM 01-04 Management and provision volume, 5.50. Chemical disinfection is an alternative if it meets the HTM's requirements. The chart only illustrates the holds.
What features should a care home washing machine have?
Programmes that reach and hold the disinfection temperatures, a pre-wash or sluice programme, automatic chemical dosing, controls staff can't change by accident, and support for annual validation. Ask suppliers to show how each programme meets HTM 01-04.
How should a care home laundry room be laid out?
So dirty linen comes in one way and clean linen leaves another, without crossing. HTM 01-04 asks for segregation of clean and dirty items and areas, hand-washing facilities, a segregated dirty area for sluicing and, at best practice, a separate laundry area with clean and soiled linen physically separated.
- Bagged at the bedsideInto the right colour bag on removal (4.3, 5.2); bags never emptied onto the floor to sort (4.5).
Dirty - Dirty areaRemove solids and sluice in a segregated dirty area (3.2).
Dirty - Load the washerInner water-soluble bags go in unopened (6.8).
Dirty → clean - DryThrough a drying process where the item allows (6.12).
Clean - Store cleanIn a clean area above floor level, not in the laundry (6.12).
Clean
- Hand hygieneWash-hand basin, liquid soap, disposable paper towels, pedal-operated clinical and domestic waste bins and a first-aid kit (3.2).
- PPEPlastic aprons and suitable gloves for handling dirty linen (4.2); appropriate PPE, including eye protection, available for all staff (3.2).
- AccessWhere enhanced processes are used, the laundry area should be accessible only to staff doing laundry duties (3.5).
- Clean storageThe NIPCM says clean linen should be stored above floor level in a designated area, preferably an enclosed cupboard that is clean, dry and cool (NIPCM 1.7).
Should a care home run its own laundry or send it out?
HTM 01-04 says owners should consider all options. It notes proper on-site facilities could be expensive and costs may be higher than anticipated, that a long-term contract with a commercial laundry could be more satisfactory and cost-effective, and that in many cases an on-site laundry may still be viable.
On-site laundry
- Residents' own clothing stays in the building
- Faster turnaround, no collection days
- You control the process and records
- Needs space, machines, staff time, servicing and validation
Outsourced laundry
- No machines to buy or maintain
- The manager and laundry staff should be satisfied the processing meets the HTM (4.8)
- Written guidelines for transport and handling agreed (4.7)
- Collection schedules and lost items to manage
Quotes in HTM 01-04 Social care volume, 2.8 and 4.7 to 4.8 (PDF). Many homes do both: personal clothing on site, flat linen outsourced. Our laundry capacity calculator shows what machines an on-site laundry would need for your beds.
How should a care home buy laundry equipment?
Ask for a site survey and a written explanation of how the proposed machines and programmes meet HTM 01-04, then compare buying, leasing and all-in monthly plans on total cost, servicing response and validation.
- Show me the programmesWhich programme each bag colour goes on, the temperatures and hold times, and how they're set.
- ValidationWho validates the disinfection stage, how often, and whether it's included.
- Response timesHow fast an engineer attends; linen can't wait in a care home.
- DosingWho supplies and sets up the chemicals and dosing, and trains staff.
- LayoutWhether the supplier will advise on a dirty-to-clean layout for your room.
- Plan optionsBuy, lease or an all-in monthly plan that includes servicing; see our leasing guide.
Get quotes for your care home laundry
Tell us about your laundry once. We pass it to a specialist UK commercial laundry equipment supplier, who will:
- Talk through your laundry: what you wash, how much, the space you have, and your water, drainage, power and any gas.
- Quote in writing to buy, lease or on a monthly plan, with delivery, installation and servicing shown.
- Explain the service cover: response times, what's included, and who to call when a machine stops.
For businesses and organisations. Prefer email? Write to hello@commerciallaundryhub.co.uk with your business type, size and the machines you need.
Related guides
Care home laundry equipment: frequently asked questions
What temperature should care home laundry be washed at?
Under HTM 01-04, standard process items are washed at the highest temperature suitable for the care label. The enhanced process uses at least 60°C, and at best-practice level a thermal disinfection cycle of 71°C for at least 3 minutes or 65°C for at least 10 minutes, or a compliant chemical disinfection process.
Do care homes need commercial washing machines?
At HTM 01-04's best-practice level, yes: it calls for an industrial/commercial-type machine capable of its disinfection requirements. At the Essential Quality Requirements level, a household machine with an A wash-performance rating, or an equivalent commercial model, can be used for the standard process.
What is HTM 01-04?
Health Technical Memorandum 01-04 is NHS England's guidance on the decontamination of linen for health and social care. It has four volumes: management and provision; engineering, equipment and validation; social care; and guidance for linen processors implementing BS EN 14065.
What colour laundry bags do care homes use?
HTM 01-04's Social care volume suggests white for the standard process and red for the enhanced process. Enhanced items are sealed in a red water-soluble bag inside an impermeable or nylon/polyester outer bag marked 'Infectious linen'.
Do care home washing machines need to be validated?
At best-practice level, HTM 01-04 says the washing machine's disinfection stage must be validated at least annually, and that an external validation contractor or the manufacturer would likely need to do the tests.
What is a sluice wash?
A pre-wash or sluice cycle rinses heavily soiled items before the main wash. HTM 01-04 says heavily soiled items should have a pre-wash/sluice cycle selected, after solids have been removed in a segregated dirty area.
Does CQC check care home laundries?
CQC regulates care homes in England against regulations including Regulation 12 (which covers preventing and controlling the spread of infection) and Regulation 15 (premises and equipment). The DHSC code of practice it refers to covers linen and laundry arrangements.
Can a care home send its laundry out?
Yes. HTM 01-04 says a long-term contract with a commercial laundry could be a satisfactory and cost-effective option, with written guidelines agreed for transport and handling, and the manager satisfied the processing meets the HTM.
Sources
We checked the facts on this page against these sources on 18 November 2026. Guidance changes: check the current version before you rely on it.
- HTM 01-04 Decontamination of linen for health and social care (NHS England publication page)
- HTM 01-04: Social care volume (NHS England, PDF)
- HTM 01-04: Management and provision volume (NHS England, PDF)
- Health and Social Care Act 2008: code of practice on the prevention and control of infections (GOV.UK, DHSC)
- National infection prevention and control manual for England, chapter 1: safe management of linen (NHS England)
- Regulation 12: Safe care and treatment (CQC)
- Regulation 15: Premises and equipment (CQC)
- Water Supply (Water Fittings) Regulations 1999, Schedule 1: fluid categories (legislation.gov.uk)